Crusher Run Calculator
Calculate the exact tonnage and cubic yardage of crusher run, ABC stone, or dense graded aggregate (DGA) needed for your driveway, patio base, or road sub-base. Includes critical compaction shrinkage factors.
How to calculate your aggregate base needs
Frequently asked questions
What is the difference between crusher run and standard gravel?
How much does a cubic yard of crusher run weigh?
Why do I need to add a compaction factor?
Are ABC Stone, CR-6, and DGA the same thing?
About this calculator
This Crusher Run Calculator takes the guesswork out of ordering base materials for hardscaping and paving by bridging volumetric geometry with industry-standard compaction behavior.
The mathematical engine utilizes the following formulas to generate your aggregate estimate:
Base Volume (cu yds) = Coverage Area × (Finished Depth in inches ÷ 12) ÷ 27
Order Volume (cu yds) = Base Volume × (1 + (Compaction % ÷ 100))
Total Order Weight (Tons) = Order Volume × Material Density Factor (approx. 1.25)
A note on installation: If your project requires 6 or more inches of base material, it is highly recommended to install and compact the crusher run in "lifts" of 3 to 4 inches at a time. Trying to compact 6 inches of loose material at once with a standard jumping jack or plate compactor often leaves the bottom layers loose, which will lead to rutting and settling down the road.